EDP Sciences
Planck 2013 results
Free Access

Table 3

SZ correction (Eq. (12)) to be applied to the CIB measurements at 217 and 353 GHz , in Jy2 sr-1 [νIν = const.].

cent

53 643 395 446 170 309 46
114 301 182 209 78 145 21
187 184 110 128 47 89 13
320 107 64 74 27 51 7.4
501 66 40 46 17 31 4.7
683 46 29 31 12 21 3.5
890 32 22 21 9.2 14 2.6
1157 18 15 9.2 5.6 4.7 1.7
1504 7.5 9.4 1.3 2.2 0.2 0.5
1956 4.4 6.7 0.2 1.2 0.0 0.1

Notes. The uncertainty on CSZcorr is of order 10%, while the uncertainty on CCIB × SZcorr is about a factor of two.

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.